S6 construction site bridge
To facilitate the work of construction vehicles on the construction site of the new S6 expressway near Słupsk, the general contractor (NDI S.A.) decided to use a professional temporary bridge over the Łupawa River. A thorough analysis of the situation indicated the JSB1 bridge as the most suitable solution - it was fully assembled in the Janson Bridging workshops and installed on site by NDI S.A. within a few hours.
Projectdetails
Oplossing
Plaatliggerbrug
Type
JSB
Lengte
24m
Breedte
3,5m
Capaciteit
Eurocode LM1

Uitgelicht

Project
After initial assembly of the 30m sections in our workshops in Hank, the Netherlands, they were transported and installed in Żabno in the Podkarpackie...

Oplossing
Plaatliggerbrug (JSB)
Jansons plaatliggerbruggen (JSB) zijn ontworpen voor tijdelijke toepassingen, met name in gebieden met een hoge verkeersintensiteit en waar een vrije...