Flyover bridge for special transports in Ostrowo
As part of the logistics operation carried out by UTC Overseas for the delivery of transformers weighing 354t and shunt reactors weighing 135t from Gdynia to Osieki Lęborskie, the JSK450 beam bridge was used to increase the parameters of the existing crossing in Ostrowo (Pomeranian Voivodeship) as a bridge above the existing bridge (so-called flyover). The crossing, 35m long (with ramps) and 5.7m wide, was completed in just a few hours.
Projectdetails
Oplossing
Balkbrug
Type
JSK-JBB
Lengte
35m
Breedte
5,7m
Belasting
Special vehicle c.400t, local regular traffic
Uitgelicht
Project
To support the transport of tanks weighing 400 tons each from Gdynia to Szczecin, our client decided to use a temporary bridge of the JSK system as a...
Oplossing
Balkbrug (JSK-JBB)
Jansons balkbruggen (JSK) zijn ontworpen voor een relatief korte vrije overspanning tot maximaal 21 meter. De balkbrug wordt vaak ingezet als tijdelij...