History: Connecting bridge Offshore platform Kizomba
The client required a connecting bridge and a work pontoon on the Caland Canal to complete an offshore platform.
Janson Bridging installed a Heavy Girder bridge, hinged to the work pontoon on the waterside and slid onto the bank on the landside.
The bridge had a length of 38 meters and a driving width of 6 meters.
Project details
Solution
Panel bridge
Type
JPB-T
Total length
38,1 meter
Road surface width
5,7 meter
Weight
118 ton
Design load
Vehicle 50 tons
Date of installation
January 2003
Dismantling date
November 2003